EasyManua.ls Logo

McFarlane RD-4125 - Maintenance Schedule

Default Icon
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reel Disk from McFarlane Mfg. 34 800-627-8569
Maintenance Schedule
1. After the rst 12 hours of use:
a. Make sure all retaining hardware is installed.
Check the tightness of all the bolts, especially
those on the C-springs. Torque speci cations are
listed in the Bolt Torque Chart in this manual.
Cotter pin and hairpin clips.
Wheel retainer bolts.
Hinge pin and hitch pin retainer bolts.
Bridge pins.
Retainer pins with wire retainer clips.
b. Check the gang arbor bolt torque which is de ned
in the “Disk Gang and Blades” section.

Table of Contents

Related product manuals