80 Product Manual PM WSC/WDC
B. Adjust chiller alignment on foundations, or subbases as called for on drawings.
C. Arrange piping to allow for dismantling to permit head removal and tube cleaning.
D. Furnish and install necessary auxiliary water piping for oil cooler.
E. Coordinate electrical installation with electrical contractor.
F. Coordinate controls with control contractor.
G. Provide all materiel required to ensure a fully operational and functional chiller.
3.2 START-UP
A. Units shall be factory charged with the proper refrigerant and oil.
B. Factory Start-Up Services: Provide for as long a time as is necessary to ensure proper
operation of the unit, but in no case for less than two full working days. During the period of
start-up, The Start-up Technician shall instruct the Owner’s representative in proper care and
operation of the unit.