11
If desired the test can be repeated by pressing the YELLOW
TEST button.
PHASE-NEUTRAL OR PHASE-PHASE LOOP IMPEDANCE
Test Lead set: OPTION 1
1. Connect the GREEN lead to NEUTRAL and the RED lead to
PHASE (or the 2nd PHASE for Phase to Phase loop
measurement).
2. The supply voltage is displayed.
Warning: The LCD 'Neons' are invalid
when using the two wire lead-set
and should be ignored.
3. The test will automatically start when voltage is detected.
4. Measured loop resistance is displayed.
If desired the test can be repeated by pressing the YELLOW
TEST button.
4. Measured loop value is displayed.
If desired the test can be repeated by pressing the YELLOW
TEST button.
High current Phase-Earth loop impedance (not at a power
socket):
Test Lead set: OPTION 1
1. Connect the GREEN lead to EARTH and the RED lead to PHASE
2. Supply voltage is displayed.
Warning: The LCD 'Neons' are invalid when using the two wire lead-set
and should be ignored.
3. The test will automatically start when voltage is detected.
4. Measured loop value is displayed.
If desired the test can be repeated by pressing the YELLOW
TEST button.
BONDED METALWORK TESTING
Test Lead set: OPTION 1
1. Connect the GREEN lead to the bonded metalwork.
2. Connect the RED lead to PHASE.
3. Supply voltage is displayed.
Warning: The LCD 'Neons' are invalid
when using the two wire lead-set
and should be ignored.
4. The test will automatically start when voltage is detected.
5. Measured loop value is displayed.