15.6 Cleaning programme parameters
Status: 01 August 2016
Cleaning programme
no.:
Boiler temperature
target value
Cleaning time set value
Cleaning
Total
Chemo-thermal disinfection process
1
59
335
360
2
59
515
540
3
59
655
720 (WW)
Disinfection procedure with the A
0
control system
23
83
341
360
27
83
461
480
39
83
341
450 (WW)
WW = Water change programme
The dosing times are adjusted to the rinse time so that the concentration is maintained
if the rinse time changes.
16 Operational problems
Despite careful construction, minor malfunctions may occur, which are usually easy to fix.
Possible errors and troubleshooting measures for the operator are described in the
following.
Always de-energise the system before carrying out work on the open appliance. To do
this, disconnect the appliance from the power supply, using the locally available main
switch.
If the described operational problems occur repeatedly, the cause must be identified.
Operational problems not described here can generally only be resolved by a
technician or electrician. Please contact your factory representative or authorised
dealer.