39 / 42 9742146
Maintenance
6. Waste water installation
Check pressure hose position on the drain pump and operation of drain pump
7. Electrical installation
Tighten all electrical connections
Check tank and boiler heating
Check temperature control and final switch
8. Electrical safety check (certificate is optional)
Check the protective earth conductor
Insulation resistance measurement
Protection conductor current measurement
Check dosage, adjust if necessary, change the peristaltic tube if necessary
Check dosage, adjust if necessary, change the peristaltic tube if necessary
11. Operational check of the complete appliance
Check appliance for correct interaction of all functions
Complete a test wash and check the cleaning results
Brief instruction for new personnel