Mellanox Technologies SN2100 - Initial Power On Procedure

Mellanox Technologies SN2100
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Rev 1.6
Mellanox Technologies
40
2.6.1.4 SN2410 Splitting Options
Figure 44: SN2410 Splitting Options
2.6.1.5 SN2100 Splitting Options
Figure 45: SN2100 Splitting Options
2.7 Initial Power On
Each system’s input voltage is specified in the “Specifications” chapter. The power cords should
be standard 3-wire AC power cords including a safety ground and rated for 15A or higher.
Step 1. Plug in the first power cable.
Step 2. Plug in the second power cable.
Step 3. Wait for the System Status LED to turn green.
The system platform will automatically power on when AC power is applied. There is
no power system. Check all boards, power supplies, and fan tray modules for proper
insertion before plugging in a power cable.
It may take up to five minutes to turn on the system. If the System Status LED shows
red after five minutes, unplug the system and call your Mellanox representative for
assistance.
The top QSFP28 ports - 49,51,53,55 (green) are splittable to 4 SFP28 ports each.
All QSFP28 ports can be split into two SFP28 ports.
The bottom QSFP28 ports - 50,52,54,56 (gray) are blocked when the upper ports are in split
mode.
All QSFP28 ports are splittable. Each port can be split to 4xSFP28 (10/25G) or 2xQSFP28
(50G) ports each. There are no blocking requirements.