12
OPERATION MANUAL
4. COMMISSIONING
4.1. PREPARATION OF THE MACHINE.
q Remove all wrapping and packing grease from the machine.
q Check the machine for loose bolts. Tighten as required.
q Inspect for oil leakage or loose ttings.
q Grease all grease nipples.
q Start pump and test Emergency stop operation
q Inform your service provider of any damage or faults with the machine.
4.2. CHECK CLAMP SAFETY MUTE STOP-
Press & hold clamp down pedal so the clamp travels down continuously. It must stop 20-28mm
above the bed. If it does not stop within the range adjust the micro switch located on the le rear of
the machine. Release pedal and repress to complete clamping.
4.3. COMMISSIONING CHECK LIST.
Before starting the machine the following checks must be carried out.
q Installation and machine preparation has been performed according to the manuals instructions.
q Fill the oil reservoir with 46 grade hydraulic oil and ensure that the oil lter breather cap is tted
q All grease nipple points have been lubricated.
q Electrical earth tted and power circuits, switches, and foot-pedal checked.
q Check power connections and any damage to wiring.
q Safety guards have been tted securely
q Check pump rotation.
q Test Emergency stop to ensure it is operating correctly.
q Test controller operation.
q Test all mechanical operations on the machine.
q Test bend material and check quality of the bend.
q Tools, equipment and personnel are clear of the machine.
q Operation Manual on how to operate the machine has been read.