9
OPERATION MANUAL
e machine must be leveled and rmly stationed on the oor where it is to be used, according
to the Installation Diagram attached.
e oor load, where the machine is to be installed, must be suitable for the weight of the ma-
chine.
3. INSTALLATION
3.1 BASE FOUNDATION AND SECURING POINTS
Before securing the machine a solid concrete base must be prepared to the specication of the
machine.
e sizes for the bolt holes position are listed as A-B. (Check with your dealer before the ma-
chine arrives)
Fig. 2.5
Instructions Manual for PB-460 (S581B)