EasyManua.ls Logo

METER AQUALAB TDL - Page 46

Default Icon
105 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 VERIFICATION AND CALIBRATION AquaLab TDL
9. After your AquaLab has finished measuring the verification
standard, a new screen will appear requesting that a 0.50 a
w
standard be placed in the chamber. Repeat steps 6 through 7
for 0.50, 0.76, and 1.00 a
w
standards.
Note: If you decide at this point not to continue with the linear
offset program, just return the lever to the Open position or
press the cancel button and you will be returned to the previous
screen.
10. When measurements are complete on all four standards, a ver-
ification complete screen appears showing the testing results
for each standard.
11. Pressing the X button will cancel the calibration process while
selecting the Check Mark will bring up the optimize prompt.
You can toggle the audio icon to turn beeping on and off.
42

Other manuals for METER AQUALAB TDL

Related product manuals