EasyManua.ls Logo

METER SC-1 User Manual

Default Icon
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SC-1

Questions and Answers:

METER SC-1 Specifications

General IconGeneral
BrandMETER
ModelSC-1
CategoryMeasuring Instruments
LanguageEnglish

Summary

1. INTRODUCTION

2. OPERATION

2.1 CONFIGURING

Steps to configure the SC-1 system date, time, and units for accurate readings.

2.2 TAKING A MEASUREMENT

Guide on how to take measurements using the SC-1 Leaf Porometer.

2.2.1 MEASUREMENT CONSIDERATIONS

Factors affecting stomatal conductance readings like light, temperature, and humidity.

2.2.2 MEASUREMENT PROCESS

Step-by-step process for taking measurements with the SC-1 Leaf Porometer.

2.3 SAVING DATA

Instructions on how to save, annotate, or discard measurement data.

2.4 VIEWING DATA

Steps to view previously saved test results on the SC-1 controller.

2.5 DOWNLOADING DATA

How to download measurement data from the SC-1 to a computer.

2.6 ERASING DATA

Procedures for erasing all stored data from the SC-1 controller or utility.

3. SYSTEM

3.1 SPECIFICATIONS

Detailed measurement and physical specifications for the SC-1 Leaf Porometer.

3.2 SC-1 SENSOR HEAD

Description of the SC-1 sensor head, its function, and components.

3.3 SC-1 CONTROLLER

Description of the SC-1 controller, its buttons, and interface.

3.3.1 TABS

Explanation of the main menus: Measurement, Data, and Configuration tabs.

3.3.2 MODES

Explanation of Auto and Manual measurement modes for the SC-1.

3.4 LEAF POROMETER UTILITY

Details on the Leaf Porometer Utility software for data management and settings.

3.5 THEORY

Explanation of the scientific principles behind SC-1 stomatal conductance measurements.

4. SERVICE

4.1 CALIBRATION

Guidance on ensuring and performing accurate stomatal conductance measurements.

4.1.1 VERIFICATION PROCESS

Steps to verify the SC-1's accuracy before taking measurements.

4.1.2 CALIBRATION PROCESS

Detailed steps for performing a user-initiated calibration of the SC-1.

4.2 MAINTENANCE

Guidelines for system inspection, parts replacement, and instrument cleaning.

4.2.1 INSTALL BATTERIES

Instructions on how to change the AA batteries in the SC-1 controller.

4.2.2 CLEAN SENSOR HEAD

Procedures for cleaning the SC-1 sensor head to maintain performance.

4.2.3 REPLACE LEAF PADS

Steps for replacing damaged or missing leaf pads on the SC-1 sensor head.

4.3 TROUBLESHOOTING

Common problems, their causes, and solutions for the SC-1 Leaf Porometer.

4.4 CUSTOMER SUPPORT

Contact information for METER customer support in North America and Europe.

4.5 TERMS AND CONDITIONS

Agreement to METER Group's terms and conditions for using the instrument.

Related product manuals