Service Manual_2023-V2.0
9
3. Installation and commissioning
3.1 Handling
1) Protect the refrigerator in moving it,Same as shown
as left photo, please move it by handcart with cushion
2) Remove all packing materials and bottom cushion,
the move into house for placement
3) After moving it to appropriate location, wait for 2 hou
rs before power on.
3.2 Door Disassembly and Assembly
When the whole refrigerator cannot enter the room, the door can be disassembled, then
assembled after entering separately.
Disassembly of Freezer door
1) Use cross screwdriver to remove the screws by
anticlockwise, and then take out the protective cover.
2) Pull out the spacing guard sheet at the two ends of
water connector, and then push the locked cushion
inwards, meantime pull out water pipe.
Note: please make sure the fast connector can’t be left
at the end of water pipe of door