EasyManua.ls Logo

Miller 22A - Installation - Continued; Equipment Connection Diagrams; 14-Pin Plug, Gas, and Volt Sense Lead

Miller 22A
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OM-193472 Page 15
1 CV Welding Power Source
With 24 VAC Power
2 CV Welding Power Source
Without 24 VAC Power
3 115 Volts AC /24 Volts AC
Power Adapter
4 14-Pin Control Cord
5 Weld Cable (Required)
6 Work
5-2. Equipment Connection Diagrams
115VAC
Contactor
3
2
6
6
5
5
4
1
4
1 Gas Hose With 5/8-18 Right-
hand Thread Fittings
(Customer Supplied)
. Shielding gas pressure not to
exceed 100 PSI (689 kPa).
2 14 Pin Plug PLG2
Use plug to make connection to
welding power source.
3 Optional Volt Sense Lead
(Part Of Meter Option)
! Weld voltage is present at
voltage sensing clamp
when wire feeder and weld-
ing power source are on.
This condition exists even if
wire feeder lights and
meters are off.
Turn off wire feeder or weld-
ing power source before
handling or moving voltage
sensing clamp.
Connect to work.
4 Power Switch
5-3. 14-Pin Plug, Shielding Gas And Optional Volt Sense Lead
802 349-A
Tools Needed:
1
3
4
5/8, 11/16 in.
2

Related product manuals