Program the Compu-M as follows: P24 = 1
L1 = 12.5
L1c = - 14.3
L2 = 25
L2c = 10.5
L3 = 37.5
L3c = - 8
Often only one point of compensation is required, usually at a low load value. In the prior example, if
compensation was only required at 11.6 kg/m, the programming could be as follows.
Compensation is optimized by establishing the next load value that agrees with the material test, hence where
compensation is zero and entering it as the next compensation point.
P24 = 1
L1 = 12.5
L1c = - 14.3
L2 = 25
L2c = 0
L3 = 37.5
L3c = 0
actual mass per material test
totalized mass by Compu-M
flowmeter response
linearized Compu-M response
% compensation
span (100%)
mass - tonnes
flowrate - tons per hour