EasyManua.ls Logo

Milltronics ML Series - Page 36

Milltronics ML Series
83 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install the handwheel panel. Connect the 37-pin plug onto
the back side of the panel assembly. Be sure the connector
locks in place when the locking ring is turned. Fasten the
panel using the hardware provided.
Connect all remaining cables to their respective plugs on the machine.
Once the machine is in place and assembled this far, have the power and air supplies
connected by qualified personnel as described in chapter 1. See the safety checklist on
page 2 for qualifications.
Level the machine (rough level) in both side to
side and front to back directions.
Slide the flood coolant tank under from the rear of the machine.
Install the conveyor (if equipped)
30

Table of Contents

Related product manuals