EasyManua.ls Logo

Mitel AG4100 Series - Check List of the Installation Process

Mitel AG4100 Series
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MITEL AG4100 ANALOG GATEWAY - QUICK INSTALLATION GUIDE
04/2024 13
3.3 CHECK LIST OF THE INSTALLATION PROCESS
Task Done by Date
Gateway guidelines.
Refer to the section 1.3 Location guidelines.
Ensure that the required equipment and tools
for the installation are available.
recommendations document included in the
rack or place the Analog Gateway on a flat
surface.
Refer to the section 4 – Hardware Installation
the Analog Gateway is correctly grounded
before plugging in the Analog Gateway.
Verify that the length of the cables is suitable
for the installation location.
installation from the IT department or the
System Administrator.
documentation of the required software.
Refer to section 5 Software installation and
configuration.
properly:
- Check the Analog Gateway
indicators. Refer to the sections 2.1.4
Mitel AG4124 Indicators or 2.2.4
Mitel AG4172 Indicators for more information.
- Check that the required telephony capabilities
function as required.