20/1531-ASP11301 Uen B5 2017-03-23 8
I
NSTALLING CABINET
2.2.2 CABINET LAYOUT
Make sure all preparations for placement of cabinets at the site, including floor marking,
were done during the site planning stage, see the environmental spec for MX-ONE
SITE PLANNING.
For examples of cabinet layouts at the MX-ONE site, see the environmental spec for
MX-ONE SITE PLANNING.
2.2.3 MOUNTING SETS
This sections lists all the mounting sets used when mounting and grounding the BYB
501 cabinets. Refer to the relevant mounting set table in each installation step.
In the tables screws are named for example M 4X8, M 4 = metric thread 4 millimeters,
and 8 = 8 millimeters in length.