EasyManua.ls Logo

Mitutoyo EH Series - 2.4 Operation Check

Mitutoyo EH Series
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Setup
10
No. 99MBC109B
2.4
Operation Check
Check the cable connections with the following procedure to conrm that the
connections are correct.
1
Turn on the power switch.
» The Counter enters the stand-by
state.
2
Press [SEL]/[CE].
» The Counter changes to the Counter
display.
Tips
EH-102Z will enter the origin-detection waiting state. To change to the Counter display,
push in the contact point of the Linear Gage to make it pass over the origin.
3
Check that the counter value is shown on the Display.
4
Check that the counter value on the Counter changes by moving the contact
point of the Linear Gage up and down.

Related product manuals