EasyManua.ls Logo

Morris C2 Contour - Page 54

Morris C2 Contour
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
5-24 August 2014 C2 Contour Air Drill
Opener Hydraulics - Continued
Pressure Adjustment (On the Go) - Continued
To raise the openers, oil ows from the tractor hose to port “B” of the valve block and out of port “E” to the opener
valve and on to the gland side of the cylinders. Oil is also felt on the line that operates the pilot operated check valve.
This causes the check valve to open and allow return oil back to the tractor.
Oil from the butt side of the cylinders travels to port “D” and through the opened pilot operated check valve to the
pressure reducing valve. Oil can not go through the reducing valve in this direction and is directed to the one way
check valve. The oil then travels through the one way check valve to port “A” of the valve block.
The oil ows through the port “A” of the valve block and back to the tractor.
Oil is also felt on the line that operates the directional lock out valve. This causes the directional lock out valve to
close preventing the oil in the accumulator from returning back to the tractor. The directional lock out valve maintains
the pressure in the accumulator in this position.

Table of Contents

Related product manuals