EasyManua.ls Logo

MPP Solar 3KVA - LCD Setting

MPP Solar 3KVA
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
LCD Setting
After pressing and holding ENTER button for 3 seconds, the unit will enter setting mode. Press SCROLL
button to select setting programs. And then, press ENTER button to confirm the selection or ESC button to
exit.
Setting Programs:
Program
Description
Selectable option
00
Exit setting mode
Escape
01
Output source priority:
To configure load power
source priority
Solar first
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, battery
energy will supply power the loads at
the same time.
Utility provides power to the loads
only when any one condition
happens:
- Solar energy is not available
- Battery voltage drops to either
low-level warning voltage or the
setting point in program 12.
Utility first (default)
Utility will provide power to the loads
as first priority.
Solar and battery energy will provide
power to the loads only when utility
power is not available.
SBU priority
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, battery
energy will supply power to the loads
at the same time.
Utility provides power to the loads
only when battery voltage drops to
either low-level warning voltage or
the setting point in program 12.
02
Maximum charging current:
To configure total charging
current for solar and utility
chargers.
(Max. charging current =
utility charging current +
solar charging current)
15A
25A (default)
03
AC input voltage range
Appliances (default)
If selected, the transfer time is within
20ms between battery mode and line
mode

Related product manuals