EasyManua.ls Logo

MSA G1 - Page 64

MSA G1
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
64
Maintenance and Care of the SCBA
GB
G1 Integrated SCBA System
(4) Remove all 6 batteries.
(5) Check the inside of the battery module for damage, battery
acid, corrosion, dirt and debris.
(6) Ensure the battery contacts are in place and secure.
(7) Insert 6 fresh C-cell batteries, ensuring the + contacts are in
alignment.
(8) Check the cover of the battery module for damage, dirt and
debris, make sure the gasket is still in place and does not
have any nicks or tears.
a) Replace cover if necessary.
Close battery module:
(9) Place the battery lid on the housing and install the screws
until the lid makes contact with the standoffs
(0,45 Nm max torque).
NOTE: This is the position of the battery lid to the housing once the
screws are tightened.
Install the battery module in the power module:
(10) Make sure before inserting the battery pack that the power
module is clean and that no pins or grooves are damaged.

Table of Contents

Other manuals for MSA G1

Related product manuals