EasyManua.ls Logo

MTU 16V 2000 G63 - General Wiring, Engine; Gearbox; Plant; Engine Wiring Check

MTU 16V 2000 G63
214 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 – 62 General Wiring, Engine / Gearbox / Plant
6.20 General Wiring, Engine / Gearbox / Plant
6.20.1 Engine wiring check
Preconditions
• Engine is stopped and starting disabled.
Material
Designation / Use Part No. Qty.
Isopropyl alcohol
Engine wiring check
1. Check securing screws of cable clamps on the engine and tighten loose screw connections.
2. Make certain that cables are securely seated in clamps and cannot move freely.
3. Check cable binders for secure seating, tighten loose cable binders.
4. Replace defective cable binders.
5. Inspect electrical components visually for damage:
• connector housings;
• contacts;
• connector sockets;
• cables and terminals;
• plug-in contacts.
6. If conduct
ors are damaged, contact Service.
7. Clean dirty connector housings, sockets and contacts with isopropyl alcohol.
M015560/00E 03-05 ©MTU

Table of Contents