MI.NET MULTI-NETWORK COLLECTOR
22
Installation and Operation Manual
INSTALLATION CHECKLIST
The installer must perform the following steps.
PRE-INSTALLATION COLLECTOR ITEMS
£ PM / INSTALLER to schedule collector install with Tier 2 at least a day in advance for availability:
(800) 323-8584
£ NOC analyst will review Prop Study to come up with range test locations for PM/Installer
£ NOC analyst to provide locations to PM / Installer for range testing
£ PM / Installer will need DCXR (preferably) or Mi.Node to drive around to Range Test locations for Range Testing
POST-INSTALLATION ITEMS
£ PM / Installer to contact Tier 2 after collector is powered up
£ NOC analyst to verify power levels on collector (message 3.15.1)
£ NOC analyst will verify communication and GPS fix (msg. 3.14.1 Get GPS Status, GPS Fix must be 3)
£ PM / Installer to drive to each Range Test location and call NOC analyst to begin testing
£ NOC analyst to verify signal strength at set locations (msg. 3.1.10 Get Received Signal Strength, RSSI > 40)
Range Test Results Notes
Location 1: |
Location 2: |
Location 3: |
Location 4: |
Location 5: |
£ Once completed, NOC analyst will store in Salesforce for record keeping.
All configuration and control of installed collector units is accomplished remotely, using cellular modem (or Ethernet) based
network links.