MI.NET MULTI-NETWORK COLLECTOR
9
Installation and Operation Manual
BEFORE YOU BEGIN
After you have installed the unit you will work with the Mueller Systems NOC group to perform the steps described in the
Post-installation Items section under Connection Procedure.
SAFETY CONSIDERATIONS
The MNC is powered by 110 - 240VAC power. This voltage can be hazardous. All external power source connections must be
performed by appropriate professionals, who are properly licensed to work within the local jurisdiction.
Collector outdoor installation should only be attempted when weather conditions permit this task to be completed safely.
You must
contact Mueller Systems Network Operations Center (NOC) at least a day in
advance of installation
to ensure a technician will be available to send appropriate test
messages over the network once the unit is installed.