EasyManua.ls Logo

multivac P100 - Page 31

multivac P100
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Start-up
Setting up the machine and putting it into operation
11.06.2014 31
¾ Position the machine on the site in such a way that the sealing bar
is on the right side.
¾ Open the chamber lid. Open the chamber lid more than half way
so that it remains open.
The chamber lid remains open in the middle position.
¾ Take all the objects out of the chamber apart from the sealing bar.

Table of Contents

Related product manuals