38
M1.2.HB240-HB240M.NLFREN 21112017
EN
9� Connect wires (g. 10).
1. Mount the control box on to the power side post.
2. Fix the limit switch into the power side post (g. 11)
3. Connect the solenoid valve and motor wire (g. 12).
Step9: Connect wires.
1. Mount the control box on to the power side post.
2. Fix the limit switch into the power side post.
3. Connect the wire of solenoid valve and motor wire
Step9: Connect wires.
1. Mount the control box on to the power side post.
2. Fix the limit switch into the power side post.
3. Connect the wire of solenoid valve and motor wire
Fig� 10
Step9: Connect wires.
1. Mount the control box on to the power side post.
2. Fix the limit switch into the power side post.
3. Connect the wire of solenoid valve and motor wire
Fig� 11
Fig� 12
copyrighted document - all rights reserved by FBC