NV10LT/NV7.5LT INSTALLATION MANUAL TABLE OF CONTENTS
VERSION 5.0 2021-03-01 PAGE 2.V
CONTENTS
Contact Information 2.iii
Release Control Record 2.vii
Preparing for installation 2.1.1
Unpacking and Positioning 2.2.1
Installing Options 2.3.1
Upgrading to Dual Exciter 2.3.2
Installing the UPS Interface 2.3.3
Redundant LVPS Upgrade 2.3.4
Installing the Remote Interface PWB 2.3.5
Installing the Orban Inside Card 2.3.6
Connecting to Station Reference Ground 2.4.1
Connecting Ac Power 2.5.1
Installing the RF Feed Cable 2.6.1
Installing Program Inputs 2.7.1
Planning Complete? 2.7.1
Routing Cables 2.7.1
Installing Control/Monitor Wiring 2.8.1
Planning Complete? 2.8.1
Routing Cables 2.8.1