EasyManua.ls Logo

NCR 5964 - Powering Up

NCR 5964
59 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-10 Chapter 3: Installation
Powering Up
This section describes powering up the workstation and the initial
checkout procedures after all hardware has been installed.
Note: No unit setup is required at installation unless the configuration
must be changed from factory defaults. The Wedge Support Disk (LPIN
G370-0701-0000) permits configuration of the operational parameters in
the Wedge.
1. Plug the terminal AC Power Cord into an AC power source.
2. Power on the workstation.

Table of Contents

Related product manuals