EasyManua.ls Logo

NEC QX-S5500G Series - Page 39

NEC QX-S5500G Series
161 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Guide
QX-S5500G Series Ethernet Switches
3. Installing the switch
3-17
Figure 3-19 Installing a power module
NOTE:
If the power module slot where you want to install a power module is covered by a filler
panel, remove the filler panel first.
When necessary power supply module is one, please insert power supply module in
power supply module slot 1. Then insert a filler panel in power supply module slot 2.
Removing the filler panel:
Loosen the captive screws of the power module with a Phillips screwdriver until they
are completely disengaged.
Put a flat screwdriver in central prominence of a filler panel, please so as not to
damage. And remove a filler panel. Please keep a filler panel in the purpose when
using it next time.
Figure 3-20 Removing the filler panel
1
2
1

Table of Contents

Related product manuals