EasyManua.ls Logo

NEC SL2100 - Installation Procedure; Power Fail Operation

NEC SL2100
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Procedure
Quick Install Guide SL2100 with ISDN PRI Trunks rev 1.1 7
Installation Procedure
1
Unpack all items and check
for damaged or missing parts.
See page 8 for details.
2
Install the trunk card
See page 9 for details.
3
Install the CPU card
See page 9 for details.
4
Mount the SL2100 system on
the wall or in the rack
See page 15 for details.
! Within suitable cabling distance from the exchange lines.
! Within suitable distance from a power socket and Earth point.
! Check the other installation considerations in section 3.
5
Connect the telephones.
See separate Quick Install Guide for the terminal type being installed
6
Connect the External MOH
Device.
Optional
See separate Quick Install Guide for the terminal type being installed
7
Connect the exchange lines.
See page 1918 for details.
8
Connect the power and switch
on the SL2100.
See page 20 for details.
9
Configure the SL2100 to the
customer’s requirements.
See page 2121 for details.
Use SL2100 PCPro software
10
Security
Ensure the system is protected against Toll Fraud and has secure
maintenance passwords
!
Consider the operation during
power failure
Will require additional parts if required for a PRI system
Power Fail Operation
It is not possible to have power fail operation with ISDN PRI trunks.
If power fail operation is required by the customer then it is recommended that additional analogue trunks are
installed.

Other manuals for NEC SL2100

Related product manuals