EasyManuals Logo

Neopost IS-280 User Manual

Neopost IS-280
226 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #201 background imageLoading...
Page #201 background image
Maintenance Processes11.2
•
These processes are only to be completed on request by SSA.
•
Check that your Mailing System is connected to the LAN or to a telephone line before
starting.
Logged as Supervisor (See How to Log in as Supervisor on page 136 ):
Press and type 7.4
Or
Select the path: Maintenance Processes
1.
Installation Process
-
Installing a Mail System for the first time.
2.
Disable base
-
Disable base from service.
-
Prepare base for removal by saving data on USB key.
3.
Swap base
-
Install a replacement base.
4.
Withdraw a PSD
-
Remove PSD from service.
-
Requires a password from Customer Services to perform.
5.
Swap PSD
-
Allows installation of a new PSD in mail system. Old PSD must have already
been withdrawn.
6.
Update registration
-
This procedure is used if you have changed your address.
-
Contact your Customer Service to change your information then you will be
instructed to perform the update registration procedure.
196
| Page 196 | dec-12-2013 12:37 |
11
Maintaining your Mailing System

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Neopost IS-280 and is the answer not in the manual?

Neopost IS-280 Specifications

General IconGeneral
BrandNeopost
ModelIS-280
CategoryPostal Equipment
LanguageEnglish

Related product manuals