22
Water System Cleaning
The cleaning of the water system of the bath (jets, pumps, and pipes) needs to be carried out as
required, but no less than after every 50 sessions.
Steam Generator Cleaning
In order to compose the maintenance plan for the steam generator cleaning, the general quality
and hardness of the water must be assessed. We recommend performing a Vital Easytest.
After every 500 work hours
After every 150 work hours
After every 50 work hours
Aster every 15 wotk hours
Other Technical Details
The fuse rating utilized in the main external
power supply circuit of stationary installed
equipment:
Circuit breakers 20A
Used equipment cannot be transported or
stored below 0 degrees C.
Minimum required water capacity to operate
the hydrotherapy tub should be ~ 1 cm
above the back jets.
Maximum allowed load on the vibrating table
is 175 kg.