Preconditions for Installation
Room
Equipment is designed for use in indoor
conditions.
The room, where the equipment is used
should be moisture proof.
Ventilation is recommended, as in the
working regime, machine creates humidity.
It is recommended to have a general drain
on the floor.
Doors must be wide at least 80 cm.
Power
Power cord material at least 3 x 2,5 mm²
copper crosscut.
Power cord should be connected into the
moisture proof junction box which is located
on the equipment frame.
Maximum power consumption for equipment
at a time is 3,7kW.
Protective device current in front of
equipment feeder not less than 16A
Water
WATER CONNECTION
2 water pressure hoses are required
one for hot, another for cold water
with one ending being 3⁄4 threaded
Length of hoses depend upon the
distance from the water inlets.
DRAINAGE
Drainage connection on the floor
should be Ø 50 mm;
Water drainage hose should be of Ø
50 mm
Length of drainage hose depending
on the distance from drainage
opening on the ground.