EasyManua.ls Logo

Nespresso EF 451 C 111 - Page 54

Nespresso EF 451 C 111
133 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Citiz service manual
54
REPAIRS
Assembly checkpoints
Wiring with three-core power cord: Wiring with two-core power cord:
Use marked cable guides to lay wires.
Check wiring (see "Wiring diagrams - model Citiz" on page 97 and following).
During assembly of the water tank connector (53) on the platform, each of its
3 latches has to engage with an audible click.
53
53

Table of Contents

Related product manuals