To check the package contents:
1.
Place the container on a clean flat surface, and cut all straps securing the container.
2.
Unpack the hardware from the boxes by carefully removing the hardware and placing
it on a secure and clean surface.
3. Remove all packing material.
4.
Verify that the package contains the following items:
a. Switch model GS408EPP
b. Power cord (varies by region)
c. Rack-mounting brackets (2)
d. Screws
e.
Straps for mounting (2)
f.
Mount
The package also contains the installation guide, which is not shown in the previous
figure.
5.
If any item is missing or damaged, contact your local NETGEAR reseller for
replacement.
Step 4: Install the switch
You can install the switch on a flat surface, attach it to a wall, pole, or table leg, or install
the switch in a standard 19-inch (48.26-centimeter) network equipment rack.
Mount the switch to a wall
The switch comes with a mount to which you can click-attach the back or bottom of the
switch.
To mount the switch to a wall:
1. Place the mount on the wall where you want to mount the switch.
2. Mark the wall where the two mounting holes are.
3. Attach the mount to the wall using the M4 x L25 mm screws provided in the package.
4. Tighten the screws with a No. 2 Phillips screwdriver to secure the mount.
5.
Line up the back of the switch (see the left figure) or the bottom of the switch (see
the right figure) with the mount.
Hardware Installation Guide21Installation
8-Port Easy Mount Gigabit Ethernet PoE+ Smart Managed Plus Switch GS408EPP