•
Solid:
•
Blinking:
•
Off:
6. Press and hold the Reset button to confirm your boot menu selection.
The system boots in the selected boot mode.
Rack-Mount Setup
Use the rack-mount hardware included with your ReadyNAS 3220 or 4220 storage system to install it in a
rack. Read Rack-Mount Precautions on page 115.
A system with installed drives can weigh more than 80 pounds.To avoid injury or damage
to the equipment, perform the rack-mount installation with appropriate assistance.
Note
Installation
Read these instructions in their entirety before you begin. Locate the shipping carton, remove the
rack-mounting kit, and prepare to work with it.
The rack-mounting kit contains two rail assemblies. Each assembly consists of two sections:
• An inner fixed chassis rail that secures directly to the system's chassis
• An outer fixed rack rail that secures directly to the rack itself
ReadyNAS 3220 and 4220
49
ReadyNAS OS 6