EasyManua.ls Logo

Nilfisk-Advance MC 6P - Lifting with Crane

Nilfisk-Advance MC 6P
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
1)
Options / model variants
Original instructions
MC 5M - MC 6P - MC 7P
4.6 Lifting with crane
1. Before crane lifting the
machine should be in
balance. Loosen the screw
(A), push the handle (B) a
little forward.
2. When the two marks are
aligned (C), the handle is in
crane-lifting -position.
3. Be carefull to fasten the
screw (D) in the lifting
position.
4. Wrap a belt strop around
center of the handle (E)
for the crane to hook in.
WARNING!
Do not stand under the
machine hanging in the
air.
AB
D
E
C

Other manuals for Nilfisk-Advance MC 6P

Related product manuals