47
Figure38.Horizontal Options
Plug
Option
7
Option
8
Inline Drain
(Field Supplied)
See NOTE 2
Collector Box Drain
(Factory Equipped)
See NOTE 2
VIEW -C-
VIEW -D-
Inline Drain
(Factory Supplied)
See NOTE 3
FLUE PIPE
AIR FLOW
1 2 3
4
5 6 7
8
COMBUSTION
AIR
HORIZONTAL RIGHT - 1 PIPE OPTION
FLUE PIPE
COMBUSTION
AIR
Rubber
Grommet
Rubber
Grommet
Plug
FLUE PIPE
Rubber
Grommet
COMBUSTION AIR
FLUE PIPE
AIR FLOW
1 2 3
4
5 6 7
8
Rubber
Grommet
COMBUSTION AIR
See VIEW C for
drain line positions
See VIEW C for
drain line positions
See VIEW D for
drain line positions
Plug
Plug
See VIEW D for
drain line positions
Flange
Flange
Option
5
Option
6
HORIZONTAL LEFT - 1 PIPE OPTION
HORIZONTAL LEFT - 2 PIPE OPTION
HORIZONTAL RIGHT - 2 PIPE OPTION
Collector Box Drain
(Factory Equipped)
See NOTE 2
NOTES:
1. See Accessories section (page 18) for optional PVC Tee configurations and drainage options.
2. All drain lines must be trapped with J-Trap or field supplied loop and drained externally from the cabinet.
3. Tubing needs to be cut to length and attached during unit installation.