EasyManua.ls Logo

NPK E Series - Checking the Gas Pressure

Default Icon
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 64 -
GAS CHARGE
CHECKING THE GAS PRESSURE
Inspect the nitrogen gas pressure every 100 hours.
PROCEDURE
1. The gas pre-charge is measured with no
preload on the tool (HH). Remove the
tool or position the hammer assembly
(DR) with the tool fully extended.
2. Remove the charge valve cap (M1) from
the hammer charge valve (M). Do not
remove the charge valve assembly!
3. Turn the NPK charge adapter T-handle
(g2) to a full counterclockwise position.
4. Install the NPK charging adapter (g1) on
the hammer charge valve located on
hammer gas head (L).
5. Tighten the charge adapter cap (g6).

Table of Contents

Related product manuals