SHENZHEN ONTIME TECHNOLOGY CO.LTD
6
Connectors
Terminals outline
J1:Connect to CNC controller.
J2:Connect to DC24V power supply, lifting motor and limit
switches.
J3:Connect to the proximity switch and plasma start switch.
J4:Connect to the arc voltage sampling terminals.
J5:Connect to the torch shield cap signal terminal.
GND:Connect to the system ground. The grounding cable
should be at least 4mm
2
.
5
1
1
7
9 6 1
5
GND