4Document History
Sure Sort™ Operator Manual
OPEX Corporation
Document History
Doc
Rev
Date Changes (click blue text to go to that page)
19-01 Feb 25, 2019 Preliminary Release
19-02 Mar 14, 2019
Initial release with the following updates:
Page 25
- interior ground symbol for AC enclosure
removed
Page 27
- photo of high-leakage current label updated
Page 28 - machine ratings/SN labels updated
Page 62 - descriptions of left & right E-stops changed
to 100 & 200 to match S/W diagnostics.
Page 63
- step 7 revised to state pull up E-stop to
deactivate; was twist. Added step 8: restart host
Page 69
- Section 2.7 LOTO procedures updated:
added EU lockout device; plug lockout device
procedure placed in separate section; “lockout switch”
changed to “main disconnect switch” handle; power
restoration steps moved to separate section
Page 86
& 90- iBOT images updated
Page 99 - BTU specs removed
Page 101 & 102- NA & EU electrical req’mts updated
Page 107
- Compliance specs updated
Page 109 - corrected machine S/N location figure;
updated label
Page 114
- “lockout switch” changed to “main
disconnect switch” handle
(continued next page)