Maintenance
- 35 -
optek-sensors AS56, Version 04.2010_1.2US, 15.04.2010
www.optek.com
9.3 Return to operation after the exchange of lamp module
Before return to operation of the entire measuring system, undertake the
following activities:
1. Switch on the converter.
2. Wait for approx. 15 minutes, until the converter has reached the working
temperature.
3. Check the system's zero-point (see instruction manual of the converter).
4. Document your settings using the form (see instruction manual of the
converter).
5. Check measuring results with regard to plausibility.
6. If settings and measuring results are correct, enable measuring.