EasyManua.ls Logo

Panasonic PT-D10000

Panasonic PT-D10000
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
Operation Instructions (1
Operation Instructions (1
0
0
)
)
Scheduling Function
Scheduling Function
1. In the group/keyword tree view pane, select the icon of a group/keyword/projector to be programmed for a
scheduled operation, and perform either (a) or (b).
(a) Right-click the selected icon, and select Schedule in the context menu (1 in the above diagram).
(b) Select File Schedule on the menu bar.
2. To add a new schedule, click Add. To correct or change an existing schedule, select that schedule and click Edit
(2 in the above diagram). * Schedules indicated in the Set Position section cannot be modified.
3. Create a schedule and click OK (3 in the above diagram).
4. The set command is executed at the specified time (PC clock time). The results will be displayed in the command
execution log pane (4 in the above diagram).
Setting items Command start time: Specified date/Everyday/Weekly (multiple days of the week can be specified) + Time
Control command: Power ON/OFF, AV Mute ON/OFF, input terminal switching (one each, sequence can be changed)
1
2
3
4
Temporarily disables the
scheduled operation.

Other manuals for Panasonic PT-D10000

Related product manuals