19
Preparations/Ј
Bottom of the unit
/㋤ಎㄇ
Extend the power cord and hose in the manner that best suits the
location where the unit is installed.
Do not flatten or bend the cord or hose.
ⶪ⥑⇦ࢍŊཚӛヅℬȮᖛᾷ
⦼խࣱሧ༿
When extending the cord and hose from the left/ ഺఢϳཚӛ᱿ᨊᗼ
When extending the cord and hose from the right/ ഺϳཚӛ᱿ᨊᗼ
Spring (to prevent the hose
from being bent)
ഃ ņ〾ᔋᖛᾷ༿ӷŇ
Front panel of the unit
㋤Ԋㄇ
Pulling the drain hose slightly toward
the inside as shown in the figure takes
up any slack between this hose and
the acidic water hose.
ᖛᾷߧḻỆെཚӷҙϳŊ߱ඖᖛ
ᖛᾷʠ⿵ᕗⰱʃሳࠡʁȯ
Cutout
⇃ם⚠
Condensation water outlet
ヮᖛᖛם
Wedge the hoses into this cutout
᮫⇃ם⚠တҘᖛᾷ
Front panel of the unit
㋤Ԋㄇ
Position the acidic water hose so that it
will not go over the condensation water
outlet (since the unit will be unstable
when it is placed right side up).
⦼խ⸅ᯘඖᖛᖛᾷᅠヮᖛᖛםȯ
ņߌ⥑⇦ᆹૌᆞⳍໞ㋤⇦ᄍʃỻહŇ
Condensation water outlet
ヮᖛᖛם
ZGS0TK7585HKE0Z.indb 19ZGS0TK7585HKE0Z.indb 19 2009/12/09 9:50:202009/12/09 9:50:20