EasyManua.ls Logo

Panasonic TK7585-SHK - Names of the Parts and Steps to Take before Operation

Panasonic TK7585-SHK
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
Names of the Parts and Steps to Take Before Operation
Hose strap
Acidic water spout
Acidic water will come out while the Alkaline Ionizer is producing
alkaline ion water. (Use it to wash dishes, vegetables, etc.)
Water supply hose
(length: approx. 90 cm)
Faucet
(not included)
Main unit
LCD display
Steps to take before operation
Operation (see pages 34 to 36)
Run alkaline ion water through the Alkaline
Ionizer for about 3 or 4 minutes
(to expel the air inside the main unit)
“Preparation time” blinks for about 20
seconds on the LCD display.
Measuring the pH level (ion concentration)
(see pages 26 and 27)
8
6
Installing the Alkaline Ionizer
(see pages 18 to 21)
3
Attaching the bypass
selector
(see pages 12 to 17)
2
Connect the power plug
to the power outlet
(see page 21)
4
Checking the faucet
(see page 11)
1
Control panel
(see page 53)
Main
spout
Bypass
selector
Acidic water stand
(with drain outlet)
Drain outlet
Acidic water and drain hoses
(length: approx. 60 cm)
Suction
disc
Water quality selector
buttons (see page 34)
Power cord
(length: approx. 3 m)
Power plug
Outlet pipe (length: approx. 45 cm)
Selecting the language of
the LCD displays
(see page 29)
5
Check that no water is leaking and also that
water is coming out of the main spout and
acidic water spout (see pages 24 and 25)
7
ZGS0TK7585HKE0Z.indb 9ZGS0TK7585HKE0Z.indb 9 2009/12/09 9:50:152009/12/09 9:50:15

Related product manuals