EasyManua.ls Logo

Parata InspectRx200 - Page 49

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InspectRx200 Operator Guide | 2 - InspectRx Preventative Maintenance Guide | 49
14. Cross off SB3
15.
Install the Dome Grounding Wires for the Upper and Lower Dome.
a. Assemble the ground wires to the Dome. Do this at the location of the two screws as shown
in image. Assemble the washer into the material of the machine so electricity can safely
leave the machine.
16.
The lower Dome needs to be ground wired inside the ZiuZ Inspector. Assemble one end of the
wire to X and the other to Y as shown in image. Again make sure you assemble the washer into
the material of the machine.

Related product manuals