EasyManua.ls Logo

Parata InspectRx200 - InspectRx & InspectRx Pro Preventative Maintenance Kit

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InspectRx200 Operator Guide | 2 - InspectRx Preventative Maintenance Guide | 56
8. Run a Production batch.
a. Check for Proper function of Pill Verification and that all bags come across properly
(noRed/missing bags)
InspectRx & InspectRx Pro Preventative Maintentance Kit
SHEET MUST BE COMPLETED AND RETURNED INSIDE THE PM KIT
Check and verify pr-pm received qty prior to beginning PM - report all inaccuracies to Parata
immediately!
Please ensure the accurate delivery and return of all unused PM parts. The represented company will
be financially responsible for used parts in the PM process, along with any discrepancy between
reported returned products.
The MERA representative is responsible for attaching the provided return shipping label and
delivering the PM kit to a UPS drop off location. Please provide:
Part Number Description
Original Kit
Quantity
Pre-PM
Received
Quantity
Post-PM
Return
Quantity
TCG
Received
Quantity
510047 Door Closure 2
510026 Snap Lock 2
510050 Grounding Kit 1
510039 Glass Plate 1
510023 Light Block Tape 1
510022 Gas Spring (INS) 1
510021 Sponge Roller 2
510017 Brush (Out) 1
510016 Brush (In) 1
510015 Belt (Infeed) 1
510014 Belt (Main) 1
340380 Microfiber Cloth 2
N/A Cleaning Kit
(Alcohol Wipes,
Q-Tips, etc.)
1
Table 3. InspectRx Collector

Related product manuals