EasyManua.ls Logo

PDC KST80-712 - Page 7

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 7 of 24
TAMPER EVIDENT NECK BANDING AND SHRINKSLEEVE LABELING MACHINERY
8 Sheehan Avenue, South Norwalk, CT 06854 USA 203-853-1516 F 203-854-0834 www.pdc-corp.com
** Please read carefully the entire manual before operating this machinery or
performing the checklist that follows.** After reading this manual, the following
is a useful checklist to refer back to, for startup of the tunnel and associated
equipment.
1.) Install. Connect the power and air (as discussed above).
2.) Power up the conveyor (and vent blower, if one exists).
3.) Check the setup sheet. Adjust the steam valves, blower speed,
and vents, accordingly.
4.) Check temperature settings on the controller.
5.) Adjust pneumatic regulator, to 18-22 psi (see below).
6.) Open the steam valve.
ARMSTRONG
PRESSURE
REDUCING
VALVE
PALL STEAM
FILTER
CONDENSATION
TRAP
STEAM FILTER
CONDENSATION
TRAP (NOT
SHOWN, ON
BOTTOM OF
FILTER)
BALL VALVE
(STEAM
SUPPLY INLET)