EasyManua.ls Logo

Peak 210C - Assemble Overhead Top Beam

Peak 210C
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
I. Assemble overhead top beam (See Fig.20).
J. Check the vertical of the columns with level bar, and adjusting with the shims if the
columns are not vertical. Tighten the anchor bolts (See Fig.21).
Fig. 20
Tighten
Adjusting with
the shims
Fig. 21
Note: Torque of Anchors is
150N.m
67A/67B
Measure the
vertical of column
from front and
side by a lever bar
or not.