B. SPECIFICATIONS OF CONCRETE (See Fig. 6)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 100mm minimum and without reinforcing steel bars
and must be dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
(210kg/cm²) minimum.
3. Floors must be level without cracks.
C. POWER SUPPLY
The electrical source must be 2.2KW minimum. The source cable size must be
2.5mm² and in good condition of contacting with floor.
III. STEPS OF INSTALLATION
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Use a carpenter’s chalk line to establish installation layout of base plate (See Fig. 7).
Model 210C 210CX
Fig. 7
Fig. 6
Chalk Line
Concrete intensive must be
210kg/cm² minimum