Home
Peak
Lifting Systems
409A
Page 52
Peak 409A - Page 52
52 pages
Manual
Save Page as PDF
To Previous Page
To Previous Page
Loading...
50
PE
A
K C
ORPORA
T
ION
No. 3 Luomu Road,Shishan T
own,Nanhai District,Foshan(528225),Guangdong,China
T
el:86-757-81
102815 81
102805
Fax: 86-
757
-81
102809
Email:peak@peaklift.c
n
http://www
.p
eaklift.cn
Manual Part No.: 721
14208
Revision Date: 2019/12
51
Table of Contents
Main Page
Table of Contents
2
Product Features and Specifications
3
Tools Required
4
Installation Requirement
4
Equipment Storage and Installation Requirements
5
Specifications of Concrete
5
Air Supply
5
Power Supply
5
Location of Installation
6
Check the Parts before Assembly
6
Steps of Installation
6
Fix the Anchor Bolts
11
Install the Safety Ladders
11
Install Safety Ladders
12
Install Power-Side Platform
13
Illustration for Cable Installation
15
Oil-Water Separator Air Flow Direction
18
Oil-Water Separator and Air Solenoid Valve
18
Install Hydraulic System
19
Install Air-Line System
20
Install Electrical System
22
Install High Limit Switch
22
Install Lower Alarm Limit Switch
22
Connecting Wire of Limit Switch on Cross Beam to Control Box
23
Connecting Wire with Control Box
24
380V Wire Connection and Circuit Diagram
25
Wire Connection Diagram in the Control Box
25
380V Wire Connection Diagram of Hydraulic Motor
25
Circuit Component
26
380V Circuit Diagram
26
220V Wire Connection and Circuit Diagram
27
220V Circuit Diagram
28
Install Spring and Safety Cover of Cross Beam
29
Illustration of Installing the Optional Air Line Kits
30
Install Air Line Kit
30
Connecting Air Solenoid Valve
32
Parts for Air Line Kits
32
Optional Extension Kit Installation
33
View for Optional Kits with Turnplate Cover
34
View for Optional Kits with Turnplate Only
34
Exploded View
35
Single Phase
42
380V/50HZ/3 Phase
43
220V/50HZ/1 Phase
43
Power Unit
43
Parts for Electric Power Unit 220V/50Hz/1 Phase
44
Parts for Electric Power Unit 380V/50Hz/3 Phase
45
Illustration of Hydraulic Valve for Power Unit
46
Test Run
46
Circuit Diagram of Hydraulic System
48
Operation Instructions
49
To Lift Vehicle
49
To Lower Vehicle
49
Maintenance Schedule
50
Monthly
50
Every Six Months
50
Trouble Shooting
51
Scarping of Equipment
51
Related product manuals
Peak 409
52 pages
Peak 412A
52 pages
Peak AMGO 414
48 pages
Peak 209
40 pages
Peak 212
38 pages
Peak 209C
41 pages